Wind Hybrid Systems For Telecom BTS Sites – Afghanistan

Brief Project Description

The project involved engineering of 20 x 8KW wind + diesel generator hybrid systems to power telecom BTS sites in areas not served by electricity grid.

Location:          Afghanistan

Technical:         20 x 8KW ground mounted wind turbines, inverters, charge controllers, diesel generators, battery energy storage systems per site, monitoring, and other balance of system equipment.

Year:                2009

Scope of Work/Role

Project Development

  • Site assessment
  • Feasibility study and financial model

Engineering

  • Preliminary system design and calculations
  • Equipment and technology selection
  • Equipment submissions
  • Detailed design and drawings