Select Country
banner
banner 2
banner - 3
banner - 4
banner - 5
banner - 6
banner - 7
banner - 8
banner - 9
previous arrow
next arrow

Solar Power Systems for BTS sites and Mining, Botswana

Brief Description of Project

Design and supply of solar systems for telecom BTS sites and mines

Location: Botswana

Year: 2014

Detailed Description

This project involved the supply of off-grid solar power systems in several locations in Botswana. The systems were for telecom BTS sites owned by Orange and Mascom. 9.6KW systems used 300W Fortune CP polycrystalline solar panels. Also included were solar batteries, charge controllers, and mounting frames.

Benefits include access to electricity, no need to use environment polluting diesel generators, and reduction in operating expenditure.

Distributors/Partners

We work with partners regards the distribution of our environmentally-friendly products, installation and maintenance in Botswana. If you would like to become one of our distributors, or you simply want to cooperate with us on a project, feel free to contact us. sales@fortunecp.com

How Can We Help You?