Select Country
banner
banner 2
banner - 3
banner - 4
banner - 5
banner - 6
banner - 7
banner - 8
banner - 9
previous arrow
next arrow

Hybrid Systems For Telecom BTS Sites – Afghanistan

Brief Project Description

The project involved engineering of 450 x 11KW solar + diesel generator hybrid systems to power telecom BTS sites in areas not served by electricity grid.

Location:          Afghanistan

Customer:         Caterpillar

Technical:         450 x 11KW ground mounted (fixed) solar panels, inverters, charge controllers, diesel generators, 96kWh battery energy storage systems per site, monitoring, and other balance of system equipment.

Year:                2019

Scope of Work/Role

Project Development

  • Site assessment
  • Feasibility study and financial model

Engineering

  • Preliminary system design and calculations
  • Equipment and technology selection
  • Equipment submissions
  • Detailed design and drawings

We work with partners regards the distribution of our products, installation and maintenance. If you would like to become one of our distributors, or you want to cooperate with us on your project, feel free to contact us. sales@fortunecp.com

How Can We Help You?