Select Country
banner
banner 2
banner - 3
banner - 4
banner - 5
banner - 6
banner - 7
banner - 8
banner - 9
previous arrow
next arrow

54KW Solar Power System – Botswana

Brief Project Description

The project involves engineering, supply and installation of 54KW solar power system to power a mine and other facilities.

Location: Botswana

Technical: 54KW ground mounted (fixed) solar panels, hybrid inverters, battery energy storage system, monitoring, and other balance of system equipment.

Year:  2015

Scope of Work/Role

Project Development

  • Site assessment
  • Feasibility study

Engineering, procurement and construction

  • Preliminary system design and calculations
  • Equipment and technology selection
  • Equipment submissions
  • Detailed design and drawings
  • Goods supply and delivery
  • Installation and commissioning

 

We work with partners regards the distribution of our products, installation and maintenance. If you would like to become one of our distributors, or you want to cooperate with us on your project, feel free to contact us. sales@fortunecp.com

How Can We Help You?