Select Country
banner
banner 2
banner - 3
banner - 4
banner - 5
banner - 6
banner - 7
banner - 8
banner - 9
previous arrow
next arrow

240KW Hybrid Systems For Telecom BTS Sites – Guatemala

Brief Project Description

The project involved engineering of 240KW solar + diesel generator hybrid systems to power telecom wireless tower sites in areas not served by electricity grid.

Location:          Guatemala

Technical:         69 x 3.5KW ground mounted (fixed) solar panels, inverters, charge controllers, diesel generators, battery energy storage systems per site, monitoring, and other balance of system equipment.

Year:                2010

Scope of Work/Role

Project Development

  • Site assessment
  • Feasibility study including Financial modelling

Engineering

  • Preliminary system design and calculations
  • Equipment and technology selection
  • Equipment submissions
  • Detailed design and drawings

We work with partners regards the distribution of our products, installation and maintenance. If you would like to become one of our distributors, or you want to cooperate with us on your project, feel free to contact us. sales@fortunecp.com

How Can We Help You?