Select Country
banner
banner 2
banner - 3
banner - 4
banner - 5
banner - 6
banner - 7
banner - 8
banner - 9
previous arrow
next arrow

150KW Wind System – Mexico

Brief Project Description

The project involved engineering of 150KW wind plus 240kWh Battery Energy Storage System to power a grid connected factory.

Location:          Mexico

Technical:         15 x 10KW wind turbines, inverters, charge controllers, 240kWh battery energy storage system, monitoring, and other balance of system equipment.

Year:                2008

Scope of Work/Role

Project Development

  • Site assessment
  • Feasibility study + financial model

Engineering

  • Preliminary system design and calculations
  • Equipment and technology selection
  • Equipment submissions
  • Detailed design and drawings
  • Bill of Quantities

We work with partners regards the distribution of our products, installation and maintenance. If you would like to become one of our distributors, or you want to cooperate with us on your project, feel free to contact us. sales@fortunecp.com

How Can We Help You?