Brief Project Description
The project involves development, finance, EPC, operation and maintenance of a 100MW solar power plant to supply electricity to commercial customer.
Location: Laos
Technical: 100MW ground mounted (tracker) solar panels, central inverters, transformer and switchgear, monitoring, weather station, fence and other balance of system equipment.
Year: 2023-2025
Scope of Work/Role
Project Co-development
- Feasibility Studies including Solar Yield Analysis and Financial Modelling
- Grid Impact Studies
- Land acquisition
- Environmental and Social Impact Assessment Studies
- PPA negotiation
- Permits and Licences
- Project finance
Engineering
- Preliminary system design and calculations
- Equipment and technology selection
- Equipment submissions
- Detailed design and drawings
- Project management, installation supervision
- Inspection and Test Plan
Procurement
- Equipment procurement and supply
- Factory Acceptance Testing
- Logistics – delivery, customs clearing, storage
- EPC contractor/sub-contractor selection including tenders and contracts
Construction
- Installation and supervision – civil, mechanical, electrical
- Site Acceptance Testing
- Testing and commissioning
- Insurances and bonds
- Training
Operation and Maintenance (Asset Management)
- On-site routine and breakdown maintenance
- Remote monitoring (Internet of Things – IoT)