60KW Solar System – Maidstone

Brief Project Description

The project involves turn-key EPC of a 60KW Grid-tie solar power system to power a building in Maidstone.

Location:          Kent, UK

Technical:         60KW rooftop solar system, 3-phase grid inverter and inverter-charger, battery energy storage systems complete with BMS and combiner, remote monitoring, and other balance of system equipment.

Year:                2023

Scope of Work/Role

Project Development

  • Site assessment

Engineering

  • Preliminary system design and calculations
  • Equipment and technology selection
  • Equipment submissions
  • Detailed design and drawings
  • Project management, installation supervision
  • Inspection and Test Plan

Procurement

  • Equipment procurement and supply
  • Logistics – delivery, customs clearing, storage
  • EPC sub-contractor selection

Construction

  • Installation and supervision – civil, mechanical, electrical
  • Site Acceptance Testing
  • Testing and commissioning
  • Operation and Maintenance manuals
  • Training

Operation and Maintenance (Asset Management)

  • On-site routine and breakdown maintenance
  • Remote monitoring (Internet of Things – IoT)