Select Country
banner
banner 2
banner - 3
banner - 4
banner - 5
banner - 6
banner - 7
banner - 8
banner - 9
previous arrow
next arrow

112KW Hybrid Systems For Telecom BTS Sites – Morocco

Brief Project Description

The project involved engineering of 112KW solar + diesel generator hybrid systems to power telecom wireless tower sites in areas not served by electricity grid.

Location:          Morocco

Technical: 112KW ground mounted (fixed) solar panels, inverters, charge controllers, diesel generators, battery energy storage systems per site, monitoring, and other balance of system equipment.

Year:                2014

Scope of Work/Role

Project Development

  • Site assessment
  • Technical and financial presentations

Engineering

  • Preliminary system design and calculations
  • Equipment and technology selection
  • Equipment submissions
  • Detailed design and drawings

 

We work with partners regards the distribution of our products, installation and maintenance. If you would like to become one of our distributors, or you want to cooperate with us on your project, feel free to contact us. sales@fortunecp.com

How Can We Help You?